energy chain

  1. March 05, 2024

    Maintenance - a key component

    Treotham has been integrating Igus products to keep Australia's mines running smoothly for more than three decades. The mining industry is no stranger to massive equipment processing millions of tonnes of rock every day.

    Read More
  2. May 15, 2023

    First certified energy chain for the dry cleanroom

    Maximum safety in battery production: first certified energy chain for the dry cleanroom

    Test passed with the best possible result: E6.29 from igus receives innovative dry cleanroom certificate from Fraunhofer IPA for ISO Class 4

    Whenever the highest hygiene standards are required, igus scores high with lubrication-free and abrasion-resistant plastic components for movement. In particular, battery production for tomorrow's mobility requires special environmental conditions, which are achieved through the combination of dry rooms and cleanrooms.

    Read More
  3. February 11, 2023

    How igus energy chains become power-saving champions.

    Roller chain links reduce drive energy for the E4.1 energy chain series by 37%

    Good news for users of the igus E4.1 energy chain series: newly developed roller chain links reduce required drive power by 37%. This allows customers to reduce their electricity costs in times of sharply rising energy prices.

    Read More
  4. August 15, 2022

    igus advances the circular economy with the world’s first e-chain made entirely of recycled material

    Cradle-to-cradle: This is the principle of the circular economy, which is abased on nature. The aim: to return consumer goods to the biological or technical cycle in order to conserve valuable resources and raw materials. The motion plastics specialist igus is also pursuing this goal and has now developed the world’s first energy chain made from recycled material on the basis of its own “chainge” e-chain recycling program.

    Read More
  5. March 15, 2022

    Connected in seconds: small plug-in igus energy chain from Treotham saves 80% assembly time

    The plug-in igus energy chain system readychain speed from Treotham connects harnessed e-chain systems in seconds and without the use of tools. This helps reduce both throughput times in assembly and machine downtimes, and also brings planned maintenance work to a minimum. The ready-to-connect e-chain system thus saves 80% installation time. With the new readychain micro-speed, this is now also possible for very small applications and in particularly tight installation spaces.

    Read More